P0E47 Hybrid/EV Battery Pack Voltage Sense E Circuit High
P0E47 means pack voltage measurement E reports more voltage than the pack can reach even when fully charged. A sense lead touching a higher potential, a broken divider resistor or a damaged input of the measuring chip are the usual explanations; real overcharging is unlikely when only one channel shows it. P0E47 is not documented by any manufacturer in public. The 2013 GM two-mode hybrid pickups and SUVs test the analogous channel A against 430 V (P0ABD), using the same 300-of-400 counter at 10 ms and running the test only while the 12 V network sits between 9 and 18 V. CARB requires battery voltage sensors to be tested against plausible limits. Low and plausibility faults of channel E are P0E46 and P0E45. Expect a warning and restricted electric drive.
Likely causes
Symptoms
- MIL and hybrid warning on
- Charging or regenerative braking restricted
- Electric drive limited or blocked
Repair estimate
Typical range across vehicles; the real cost depends on what the testing finds.
Parts involved
Related codes
References: gsi.ext.gm.com, law.cornell.edu.