P20BD Reductant Heater B Control Circuit/Open
Heater B's control circuit is open. In GM's tables heater 2 is the DEF line heater; the 2025 version detects the open state with the output off and sets a Type A code after two seconds, while the 2018 version relies on an open status reported by the DEF control module with battery voltage above 11 V. Deutz assigns B to the pressure line heater, the hose from pump to dosing valve. Hino numbers differently: its 2018 bulletin calls P20BD heater 1 of the heated DEF line on J05 cab-overs and asks for a resistance check at the 6-pin connector before the line assembly is replaced. On the Touareg CNRB, VW stores the code when the power stage's diagnostic signal drops below 4.70 V. A frozen pressure line delays or blocks dosing in cold weather. Short circuits of the same element are P20BF and P20C0.
Likely causes
Symptoms
- Warning lamp, especially after cold nights
- DEF pressure builds slowly or not at all in frost
- Inducement countdown with eventual speed limit
Repair estimate
Typical range across vehicles; the real cost depends on what the testing finds.
Parts involved
Related codes
References: static.nhtsa.gov, gsi.ext.gm.com, gsi.ext.gm.com, static.nhtsa.gov.