P2A96 Alternative Fuel Tank Select Valve B Control Circuit Performance
P2A96 is about tank select valve B working electrically but not doing what it is told. In an LNG layout like the one in Westport's US8726785B2, where one pump draws from either of two vessels through an insulated select valve, the module can verify the switch from the pump's behaviour: right after selecting a full vessel, the drive work per stroke should be normal, whereas a reading that stays low suggests the pump still sits on the empty side. The same patent warns that low work can also come from a mechanical defect, so a plausible check compares readings before and after the command. Cold-stiffened seals, ice and debris can hold the valve back. No manufacturer publishes P2A96 or its test window.
Likely causes
Symptoms
- Malfunction lamp on
- Gas supply drops right after a tank change
- One vessel stays full while the other runs dry
Repair estimate
Typical range across vehicles; the real cost depends on what the testing finds.
Parts involved
Related codes
References: law.cornell.edu, patents.google.com.